Skip to main content

NIDO 2 - APARTMENT HOUSING, COMMERCIAL PREMISES BRATISLAVA - WATERPROOFING COATING

22.12.2021

Completely waterproofing coating.

  • Surface preparation by shot blasting with edge grinding
  • Horizontal surface insulation, including penetration and polyurea
  • Closing of vertical wall lunks (epoxy)
  • Insulation of vertical parts including preparation of 500Bar (penetration + polyurea)
  • Insulation of vertical parts above the UV, including preparation up to 500Bar (UV protective coating)
  • Dilatations