2020 – 2022, D48 Frýdek-Místek, bypass I. stage, D56 and connection to D48
14.06.2022
Milling of the bridge deck,
Insulation of common constructions against free standing water,
Full-area insulation of the bridge deck with asphalt strips,
Polymer insulation of the bridge deck under the ledge,
Polymer insulation of the bridge deck under the roadway,
Insulation of the bridge deck under the ledge with asphalt strips with a sealing layer,
Insulation of the bridge deck under the roadway with asphalt strips with a sealing layer,
Protection of the insulation on the surface with asphalt strips.
Bridge deck insulation and cast asphalt.


