2021 – 2022, Expressway R2 Kriváň, Lovinobaňa (Mýtna-Tomášovce section)
19.01.2022
Implementation of bridge deck insulation.
- Milling
- Preparation of the substrate by shot blasting with edge improvement
- Coating of plasters and concrete surfaces, epoxy paint
- Waterproofing and ground moisture of bridge decks with strips
- Tests according to KSP – tensile strength of surface layers

