2021 – 2022 NIDO 2 – Apartment housing, commercial premises Bratislava
15.06.2022
Complete waterproofing coating.
- Preparation of the substrate by shot blasting with edge improvement
- Isolation of the horizontal surface including penetration and polyurea
- Preparation of the substrate by grinding
- Closing of holes in vertical walls (epoxy + schtellmitell)
- Insulation of vertical parts (reversed lintels, walls) including preparation of the substrate VVL up to 500 Bar (penetration + polyurea)
- Insulation of vertical parts above the terrain UV stable including preparation of the substrate VVL up to 500 Bar m2 (UV protective coating)
- Details – connection to the filling of holes near the terrain (PCI Pecitape® Butyl 120 + substrate penetration)
- Dilatations hidden under the terrain (glue, strip)
- Dilatation profile additional



