Bridge blasting, rehabilitation and protective coating
Renovation of the bridge in the scope of 16,098m2 divided into 6 stages.
The complete reconstruction of the bridge consists of the reconstruction of the upper structure and rehabilitation of the lower structure, which we carry out in full.
After blasting the reinforced concrete structure with a high-pressure water jet at a pressure of up to 2500 Bar, followed by reinforcement protection with Sika MonoTop 910 N, we sprayed the full-surface coarse remedial mortar SikaRep CZ, then a fine full-surface remedial trowel Sika MonoTop 620 and finished with final protective coating SikaGard 675 W ElastoColor.
The aim of the taking over works is to return the Štětí Bridge to its original properties, safely fulfill its function and significantly improve the technical condition of the bridge.