Parking – Gdańsk

22.10.2025

For a business partner in Poland, we successfully reconstructed a three-lane parking ramp in a shopping center in Gdansk.

The work took place under full operation and in difficult weather conditions with temperatures below 5 °C.

Due to the climatic conditions, we used special materials – primer, polyurea and top coat.

The surface was made in anti-slip R12 design on a total area of ​​680 m².

Despite the rainy weather, we flexibly adapted to the conditions and completed the work within 14 days.